Tawi Riverfront:
- Project Cost:
- Phase-I: ₹210.00 Cr.
- Phase-II: ₹320.00 Cr.
- Construction of embankments/ retaining wall with channelized section 250m wide and for a length of 3.5km on both sides.
- Raising of barrage height to achieve adequate water height (ponding) at Gujjar Nagar bridge.
- Lower promenade (10m wide) and Upper promenade (10m wide).
- Reclamation of land approx. 14.23hectare (281.3 kanals).
- Laying of water supply lines, trunk sewers & pumping stations & extension of storm water drains to the river.
- Pier protection works of existing bridges 4 no.s.
- Date of Start: Not Started.
- Executing Agency: Jammu Smart City Limited (JSCL).